PKP Świdnik Miasto. 2026

Świdnik 2026-11-17

Świdnik Miasto railway station.

Geographical coordinates: 51.223 N 22.694 E. Elevation: 211 m.

Świdnik Miasto. 2026. Photo by Karol Placha Hetman
Świdnik Miasto. 2026. Photo by Karol Placha Hetman
Świdnik Miasto. 2026. Photo by Karol Placha Hetman
Świdnik Miasto. 2026. Photo by Karol Placha Hetman
Świdnik Miasto. 2026. Photo by Karol Placha Hetman

The Świdnik railway station was opened in 1905, during the period when Poland was still under foreign partitions. At that time, both Lublin and Świdnik (then known as Adampol—a village) were under Russian rule. It is worth noting that during the partition era, the station was called Adampol.

A small, single-story red-brick station building with an unused attic was constructed. Its building process spanned the years 1905–1914. This structure is located to the west of the current Świdnik Miasto station. The old station building still exists today (as of 2026) and serves exclusively as a residential building; it is the oldest house in Świdnik.

In 1967, a new station and stop—Świdnik Miasto—were built at a different location. This was done to facilitate the daily commute for thousands of employees working at the PZL WSK Świdnik plant. The station was a typical modernist structure, consisting of two small buildings sheltered by a shared flat roof. One section served as a waiting area and ticket office, while the other housed railway staff facilities. The old station became a freight station, and a new one—located further to the east—became the passenger station.

Between 2006 and 2007, the platforms at the Świdnik Miasto station underwent renovation. The old shelters were removed and replaced with new ones. The surface, previously made of paving slabs, was replaced with cobblestones. New prefabricated red slabs were laid along the edges of the platforms. New lighting and an audio system were also installed. The platforms were raised by only 0.10 meters.

New Railway Station. 2022.

Between 2020 and 2022, the railway station underwent a major renovation. The building was thoroughly reconstructed and adapted to meet contemporary needs. Its façade features grey panels and extensive glazing. Canopies have been installed on both sides of the building, sheltering bicycle racks and motorcycle parking spaces. The parking area accommodates up to 28 bicycles and includes a repair station for cyclists. On the town-facing side, the façade bears the dark blue inscription “PKP Dworzec kolejowy” (PKP Railway Station), while the platform-facing side displays the sign “PKP Świdnik Miasto.” Analog clocks complete the design. The station was built as part of the “Innovative System Stations” (Innowacyjne Dworce Systemowe) project, based on a proprietary concept developed by PKP. The building reaches a maximum height of 8 meters, and its roof is equipped with photovoltaic panels. It also features modern security systems, including video surveillance, access control, and intrusion and robbery alarm systems.

The facility is divided into two sections. The first contains a waiting area equipped with benches, display cases, electronic train arrival and departure boards, an audio information system, and a clock. This space is both heated and air-conditioned. The second section is designated for commercial use. Restroom facilities are also available to passengers.

The new station is free of architectural barriers and offers numerous amenities for people with disabilities, including: …paths throughout the building and its surroundings, Braille signage, high-contrast color schemes, and tactile maps of the facility. A car park and a public transport stop were also constructed next to the station. Świdnik was slated to receive three hydrogen-powered buses.

The station is modern and comfortable. It is the third station to be renovated in the Lublin Voivodeship. The “United Right” (Zjednoczona Prawica) government had planned the renovation of 11 stations in this region, allocating 150 million PLN in the budget for this purpose. Unfortunately, these plans were derailed following the change in government—referred to as the “December 13th Coalition.” The new station opened in November 2022. The project cost 5.2 million PLN, with funding provided by the European Union through the Operational Programme Infrastructure and Environment. The investment was carried out by PKP S.A., with a consortium consisting of Heli-Factor Sp. z o.o. and Merx Sp. z o.o. serving as the contractor.

It is worth recalling that the United Right government planned the renovation or reconstruction of approximately 190 railway stations across Poland, with 3.5 billion PLN allocated for this purpose.

Railway lines.

The following railway lines pass through the Świdnik Miasto station:

Railway Line No. 7, running from Warszawa Wschodnia (Warsaw East) to Dorohusk—historically known as the Vistula Railway (Droga Żelazna Nadwiślańska). The line currently spans 267.471 km. It is a double-track line, with the exception of the section near the national border, and is electrified using a 3 kV DC system. The maximum permitted speed is 160 km/h.

Railway Line No. 67, running from Lublin Główny (Lublin Main) to Świdnik, is a short, 7.591 km-long double-track line. It is electrified with a 3 kV DC system. The line was constructed in 1877. Electrification was carried out in two stages: the section between Lublin Główny and Lublin Tatary was electrified in 1968, followed by the section between Lublin Tatary and Świdnik in 1981. The maximum speed on this route is 80 km/h.

Railway line No. 581, running from Świdnik to the airport (Świdnik Port Lotniczy), is a 3.695 km long, single-track line electrified with a 3 kV DC system. Established in 2012, it was designed to transport passengers from Lublin to the airport. The maximum speed on the line is 60 km/h. In reality, the line is an extensive modernization of a railway siding that once connected the Świdnik station to the PZL Świdnik helicopter manufacturing plant. The decision to revitalize railway line No. 581 was made in 2008, alongside the plan to construct a passenger stop next to the airport terminal. The project, including the necessary infrastructure, was approved in 2011. A 2.500 km section of the line—the portion approaching the airport—was built along an entirely new alignment. The line opened on December 14, 2012, coinciding with the launch of the new commercial airport. It runs from track No. 16 at the Świdnik Miasto railway station to a buffer stop located by the terminal platform. In addition to passenger traffic, the line also serves a railway siding within the industrial area, providing access to several companies: the GIGA combined heat and power plant, RPP Świdnik, and WSK Świdnik.

Świdnik Miasto Station.

The station features two platforms. Platform 1 is a single-edge platform and serves trains traveling in the direction of the city of Chełm. The platform is 200 meters long. It is covered, illuminated, and equipped with benches, display cases for railway information, and trash bins. The surface consists of paving stones and 1-meter-wide red edge tiles, featuring a yellow warning line and tactile paving studs. Platform 2 is an island platform with two edges. Trains bound for Lublin stop at the southern edge, while trains to or from the airport stop at the northern edge. The surface of Platform 2 is identical to that of Platform 1. Access to the platforms is provided via a tunnel running beneath the tracks and platforms. This tunnel also connects the town of Świdnik with its industrial district.

In July 2024, 50 passenger trains departed from the Świdnik Miasto station daily. Destinations included: Bełżec, Bydgoszcz Główna, Chełm, Dęblin, Dorohusk, Hrubieszów Miasto, Yahodyn (Jagodin), Lublin Airport, Lublin Główny, Świnoujście, Terespol, Warszawa Wschodnia, and Zamość Wschód.

On November 17, 2026, 61 passenger trains departed from the Świdnik Miasto station. Destinations included: Bydgoszcz Główna, Chełm, Dęblin, Frankfurt/Oder, Hrubieszów Miasto, Jagodin, Kraśnik, Lublin Główny, Łuków, Poznań Główny, Szczecin Główny, Świnoujście, Terespol, Warszawa Zachodnia, Zamość Wschód, and Zielona Góra Główna. Among these were the following InterCity long-distance trains: No. 22100 *Bystrzyca* (Bydgoszcz Główna – Rzeszów Główny), No. 82170 *Uznam* (Chełm – Świnoujście), No. 7206 *Warta* (Chełm – Poznań Główny), No. 7204 *Zielonogórzanin* (Chełm – Zielona Góra Główna), No. 8202 *Górski* (Chełm – Szczecin Główny/Zielona Góra Główna), No. 440 *Uznam* (Frankfurt/Oder – Świnoujście), No. 20101 *Bystrzyca* (Hrubieszów Miasto – Lublin Główny), and No. 12010 *Kyiv Express* (Jagodin – Warszawa Zachodnia)—a total of eight pairs of InterCity trains.

There is also a passenger stop in Świdnik called Świdnik Wschód.

Written by Karol Placha Hetman

Kategorie: